Feasibility Study and Detailed Engineering Design of Water Supply and Sanitation Systems for Karuma and Diima towns

Client     : Water and Sanitation Development Facility-Central (WSDF-C)
Duration : December 2020 – Ongoing
Project Cost : USD 51, 472.72

PROJECT DESCRIPITON

WSS Services (U) Ltd was contracted WSDF-C to carry out Feasibility Study and Design of Karuma and Ddiima piped water systems

Date :

November 1, 2022

Rating :